These pictures were all taken from the same spot, looking in through the future basement door.
This is the day Larry was backfilling around the foundation. Dave had attached the insulation below the finished grade, and here Larry is spreading gravel in the basement to bring the floor up to the desired grade.
Here Billy and his crew have spread the plastic vapor barrier on the gravel, and are determining the final grade before pouring the basement floor.
A few days after the floor was poured. this shot really shows up my permanent basement "decorations."